Hi All,
I am doing some hopper flow discharge simulation of granular material. The hopper is fitted with a "stopper" at the discharging outlet. I want to periodically open the stopper (translation motion) from closed position to fully open within say 10 seconds of simulation time.
Which command do I use to allow the "stopper" fix to open periodically.
I look forward to your help.
Regards,
Theo_Score
Westbrink | Thu, 12/01/2016 - 12:52
Hi Theo,
Hi Theo,
I suggest that the wiggle command can be solve the problem.
For example
fix move_stopper all move/mesh mesh stopper wiggle amplitude 1 0 0 period 10
For more details check the doc please.
Regards,
Westbrink
Theo_Score | Fri, 12/02/2016 - 00:39
Gate valve opening - Solution
Hi Westbrink,
Thank you very much for responding to my thread. You solved my query.
Best regards,
Theo